Skip to main content
Creamie Interiors

Projects

The work, before the paint.

Plastering is finished at the exact moment before it disappears, so this is the building at its most perfect and least finished. What you are looking at is the base every other trade stands on.

Recent work

A raking ceiling plane meeting a wall, finished solid
A stopped gable room with a mobile scaffold standing under the apex and glazing to the yard
A stopped room looking through a doorway to bare framing in the space beyond
Two raking ceiling planes meeting, the joint stopped flat
A stopped passage opening to sliders and the hills, a vacuum on the floor
A stopped and flushed open-plan room under a gable ceiling, a doorway through to the next space
A leather tool belt, tape measure and trowels stood against a stopped corner
A hawk loaded with compound resting on the floor beside two trowels
A pink fire-rated board corner with its bead set, close up
The half-round window and its curved reveal seen from further back
A pair of plasterer's stilts laid down on a concrete floor
A stopped external corner where a bulkhead meets the ceiling
A ladder and a pair of stilts parked against a timber post in a bare garage bay
Raking ceiling planes stopped, a window at the eave
A stopped wall beside a tall window, sun across it
A step ladder open beside a timber post in a bare bay, stopped walls beyond

Get in touch

Have a project coming up? Send through your plans, drawings or project details and we'll be in touch.

Based inQueenstown & Central Otago

Request a quote